The Challenge
The Gel Break Pump package included main equipment, level switch scope, and FAT/certification records that needed to become readable public content while excluding internal records and sensitive identifiers.
Supply of McFarland Gel Break Pump package for PTSC M&C, including level switch, oil, and public summaries for testing and certification documents.

Client
PTSC M&C
Project Code
LDVA-MEC-008
Location
PTSC M&C project scope
Completion Date
Jan 6, 2025
The Gel Break Pump package included main equipment, level switch scope, and FAT/certification records that needed to become readable public content while excluding internal records and sensitive identifiers.
TTE normalized data from shipping status, packing/handover records, and principal documents into scope, compliance, FAT/testing, and accessory support groups so the website can show a case study instead of publishing source documents.
Completed a public summary for the 1-unit Gel Break Pump package with level switch and oil, clearly presenting scope, FAT status, and certification groups without exposing sensitive document details.
Main equipment scope covering 1 Gel Break Pump unit from McFarland.
Shipping status records FAT: Yes and is presented as a public summary.
Level switch scope is separated as an accessory support group for quick scanning.
Public content is limited to scope, FAT status, certificate summaries, and handover summaries.
TTE coordinated client, principal, and accessory-scope data; controlled packing, handover, FAT, and certificate summaries to ensure the public page only displays cleaned project information.
Handover of the Gel Break Pump scope as a public summary.
Completed level switch scope and related certificate group as a summary.
Jan 6, 2025
Shipping status recorded completion for the Gel Break Pump scope.
1
Unit
McFarland
FAT: Yes
-
-
-
-
-
-
-
-
-
-
-
-
-
-
McFarland
-
Shipping status records FAT: Yes.
Packing list and handover summaries for the pump and level switch at a public-safe level.
Shipping status records FAT: Yes for the Gel Break Pump; frontend displays only a summary status.
Summary of COO and supporting records for the level switch/accessory scope.