PQ-HWP0-MEC008 Plunger Pump Package

Supply of McFarland plunger pump package with lifting accessories, oil, and commissioning spares for PTSC M&C.

Plunger Pump PackageMcFarland
PQ-HWP0-MEC008 Plunger Pump Package

Project Overview

Client

PTSC M&C

Project Code

PQ-HWP0-MEC008

Location

PTSC M&C project scope

Completion Date

Jul 10, 2025

Project Gallery

6 photos

The Challenge

The plunger pump package combined main equipment, lifting accessories, oil, and commissioning/start-up spares, requiring coordinated control between the principal and supporting sub-vendors before handover.

The Solution

TTE coordinated with PTSC M&C, McFarland, and supporting vendors to align scope, track readiness, consolidate public-safe quality documentation summaries, and keep internal records and sensitive identifiers outside the public scope.

Outcome

Completed public summary handover for the Plunger Pump package covering 4 units, lifting accessories, oil, and commissioning/start-up spare groups, with certifications presented as safe documentation categories.

Technical Highlights

4-unit plunger pump package

Main equipment package covering 4 Plunger Pump units from McFarland.

Lifting and auxiliary items

Includes sling/shackle sets and oil for the equipment handover scope.

Commissioning spare readiness

Wet end seal, air drive seal, and air valve housing seal spare groups summarized to support commissioning/start-up.

Public-safe document control

Certification records grouped at COO, COC/CQ, MTC, test, and warranty level without publishing source documents.

TTE Involvement

TTE coordinated the client, principal, and sub-vendors; managed item lists, spare groups, packing, handover summaries, and document control so the public content is limited to scope, compliance summaries, and delivery role.

Delivery Timeline

First handover batch

Batch handover for equipment and accessories scope, shown only as a public summary.

  • Equipment and accessories under the Plunger Pump package
  • Public-safe handover summary

Second handover batch

Completed remaining items and quality/certification document groups as categorized summaries.

  • Commissioning/start-up spare groups
  • Origin, quality, test, and warranty summaries

Completion status update

Jul 10, 2025

Shipping status recorded completion for the public project scope.

Scope of Supply

Plunger Pump

4

Unit

McFarland

-

Sling and shackle set

3

Unit

-

-

Oil

-

-

-

-

Commissioning / start-up spare parts

-

-

McFarland

-

Wet end seal kit

-

-

McFarland

-

Air drive seal kit

-

-

McFarland

-

Air valve housing seal kit

-

-

McFarland

-

Documentation & Compliance

COO

Packing list summary

Certificate of conformity and quality

Warranty certificate

MTC summary

Manufacturer test certificate summary

Test report summary

Goods inspection summary

Public Documentation Groups

Handover & packing

Packing list and two batch handover summaries at a public-safe level.

Packing list summaryBatch handover summaryGoods inspection summary

Quality & compliance

COO, COC/CQ, MTC, and test certificate records grouped as public descriptions.

Certificate of origin summaryCertificate of conformity and quality summaryMaterial certificate summaryManufacturer test certificate summary

Spares & commissioning

Summary of spare kit groups for commissioning/start-up without publishing detailed part numbers.

Wet end seal kit groupAir drive seal kit groupAir valve housing seal kit group

Warranty & testing

Warranty certificate and test report summaries from the principal/sub-vendor scope.

Warranty certificate summaryTest report summary